- Register the Schmmgmt.dll library by pressing Start > RUN and typing:
regsvr32 schmmgmt.dll
- Press OK. You should receive a success confirmation.
- From the Run command open an MMC Console by typing MMC.
- On the Console menu, press Add/Remove Snap-in.
- Press Add. Select Active Directory Schema.
- Press Add and press Close. Press OK.
- If you are NOT logged onto the target domain controller, in the snap-in, right-click the Active Directory Schema icon in the Console Root and press Change Domain Controller.
- Press Specify .... and type the name of the new role holder. Press OK.
- Right-click right-click the Active Directory Schema icon again and press Operation Masters.
- Press the Change button.
- Press OK all the way out.
Transferring the FSMO Roles via Ntdsutil
To transfer the FSMO roles from the Ntdsutil command:
Caution: Using the Ntdsutil utility incorrectly may result in partial or complete loss of Active Directory functionality.
- On any domain controller, click Start, click Run, type Ntdsutil in the Open box, and then click OK.
Microsoft Windows [Version 5.2.3790] (C) Copyright 1985-2003 Microsoft Corp. C:\WINDOWS>ntdsutil ntdsutil:
- Type roles, and then press ENTER.
ntdsutil: roles fsmo maintenance:
Note: To see a list of available commands at any of the prompts in the Ntdsutil tool, type ?, and then press ENTER.
- Type connections, and then press ENTER.
fsmo maintenance: connections server connections:
- Type connect to server
, where is the name of the server you want to use, and then press ENTER.
server connections: connect to server server100 Binding to server100 ... Connected to server100 using credentials of locally logged on user. server connections:
- At the server connections: prompt, type q, and then press ENTER again.
server connections: q fsmo maintenance:
- Type transfer
. where is the role you want to transfer.
For example, to transfer the RID Master role, you would type transfer rid master:
Options are:
Transfer domain naming master Transfer infrastructure master Transfer PDC Transfer RID master Transfer schema master
- You will receive a warning window asking if you want to perform the transfer. Click on Yes.
- After you transfer the roles, type q and press ENTER until you quit Ntdsutil.exe.
- Restart the server and make sure you update your backup.
No comments:
Post a Comment